Parque eólico Sierra Gorda (Chile)

por | Jul 5, 2016

WIND FARM SIERRA GORDA (CHILE)

A new Project commences for our branch office Tecnorenova Chile. This project is located at the north of the country, exactly at the village of Sierra Gorda, in the region of Antofagasta.

Our client, Gamesa, is going to install 56 wind turbines with a power of 2 MW, however, in this case, with blades which reach 57 meters long. The project has as a final client the Italian renewables energy company Enel Green Power. After the performance of this project, the total capacity installed in Chile will be near 1200 MW, of which almost 600 MW are produced by wind energy.

Our role in this project is the support and coordination of transport of every component of the turbines from the port of Angamos in Antofagasta to the wind farm. Due to the fact that never in Chile this type of blade was transported before, new equipment has to be acquired by the company.

Always compromised with the evolution of the wind farm.

Tercer proyecto eólico de Gamesa en Chile

http://www.bnamericas.com/project-profile/es/parque-eolico-sierra-gorda-este-sierra-gorda-este

http://www.energiadiario.com/publicacion/enel-green-power-construye-un-parque-eolico-de-112-mw-en-chile-por-196-millones-de-euros/

ARTÍCULOS RELACIONADOS

Parque Eolico La Florida – Uruguay

Desde hace cuatro años Tecnorenova lleva trabajando en diferentes proyectos en Uruguay. En el año 2015 estamos presentes como empresa en este nuevo país, para responder a todas las ofertas de nuestros clientes con la mayor calidad posible. En este nuevo proyecto La...

leer más

Uso de cookies

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.plugin cookies

ACEPTAR
Aviso de cookies